Southwestern Greyhound's new $800,000 terminal described; 1 1/2 story building is air conditioned with exterior faced with brick, granite, glazed tile and terra cotta; windows and door casings are aluminum; fronts 150 ft each on two streets and has 50 × 250 ft covered loading area which handles total of 372 scheduled arrivals and departures daily.
Houston's new bus terminal
Bus Transportation
Bus Transportation ; 27 , n 11
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1996
Online Contents | 1994
Houston's Jetero airport -- Development of terminal and related areas
Engineering Index Backfile | 1963
|Houston's storage and service garage
Engineering Index Backfile | 1912
Land use development for Houston's intercontinental airport
Engineering Index Backfile | 1965
|