Highway tunnel under Houston Ship Channel will replace ferry; tunnel, being built by trench method, will be 3786 ft long between grade points and 2936 ft long between portals, with 6% grades, and will provide clear channel depth of 45 ft; concreting methods; approach tunnel details; high speed ventilation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Subaqueous vehicular tunnel under construction at Pasadena, Texas


    Additional title:

    Roads Streets


    Contributors:
    Smith, W.H. (author)

    Published in:

    Publication date :

    1949


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Problem of subaqueous tunnel between France and England

    Zehnder | Engineering Index Backfile | 1949


    Pasadena tackles its parking

    Miller, J.M. | Engineering Index Backfile | 1945


    LAYING METHOD OF SUBAQUEOUS CABLE AND LAYING STRUCTURE OF SUBAQUEOUS CABLE

    HIGASHI DAISUKE | European Patent Office | 2015

    Free access

    Breath equipment of subaqueous

    KIM JIN WOO / KIM BU GEON | European Patent Office | 2021

    Free access