Highway tunnel under Houston Ship Channel will replace ferry; tunnel, being built by trench method, will be 3786 ft long between grade points and 2936 ft long between portals, with 6% grades, and will provide clear channel depth of 45 ft; concreting methods; approach tunnel details; high speed ventilation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Subaqueous vehicular tunnel under construction at Pasadena, Texas


    Additional title:

    Roads Streets


    Contributors:
    Smith, W.H. (author)

    Published in:

    Publication date :

    1949


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English