Confronted with problem of economically maintaining good riding track in two tunnels on Birmingham District of Central of Georgia Railroad, it was decided to experiment with welded joints; both tunnels are single track 2431 ft long and 1198 ft long. Before Int Acetylene Assn. (see also Welding Engr v 23 n 1 Jan 1938 p 27-31)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Butt-welding of railroad rails


    Additional title:

    Welding J (NY)


    Contributors:

    Published in:

    Publication date :

    1938


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Butt-welding of railroad rails

    Cummins, R.R. | Engineering Index Backfile | 1938


    Butt-welding of railroad rails

    Cummins, R.R. | Engineering Index Backfile | 1938


    Butt-welding of railroad rails

    Cummins, R.R. | Engineering Index Backfile | 1938


    Flash butt welding of railroad rails on road-bed

    Kutschuk-Jazenko, S.I. / Tscherednitschok, W.T. | Engineering Index Backfile | 1966


    Automatic butt welding of rails, London transport

    Engineering Index Backfile | 1938