Two improvements in color light signaling on main line railways are completion of Southern Region's program between London and Brighton, and introduction of multi-aspect working on Western Region; third development recorded is introduction by London Transport of remote controlled interlocking machine that has replaced locally operated frame at Aldersgate station.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Three improvements in railway signalling


    Additional title:

    Engineering


    Published in:

    Engineering ; 179 , n 4661


    Publication date :

    1955


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Railway signalling

    Smart, V.I. | Engineering Index Backfile | 1910


    Railway signalling

    Parker, C.W. | Engineering Index Backfile | 1923


    Railway signalling

    McArd, G.W. | Engineering Index Backfile | 1946


    Railway signalling

    Murphy, John | Engineering Index Backfile | 1909


    European railway signalling

    Institution of Railway Signal Engineers | SLUB | 1995