Protection of Polaris and Poseidon missiles during loading operations from tender can be accomplished either by adding shock absorbing system to loading fixture, or by eliminating relative motion between load and submarine deck (so-called Yo-Yo system); results of analysis of operation of both systems are presented in diagrams and discussed.
Missile handling analysis
U S Naval Research Laboratory -- Shock Vibration
1967
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Missile trailer provides universal handling
Engineering Index Backfile | 1958
|Missile Handling and Mating System
NTIS | 1964
|Missile trailer provides universal handling
Engineering Index Backfile | 1958
|“HYDRAULICS FOR MISSILE HANDLING AND ERECTION”
SAE Technical Papers | 1959
|Hydraulics for missile handling and erection
Engineering Index Backfile | 1959
|