Mass transportation on open-pit mining sites; comparison of advantages and disadvantages of rail transport and belt handling indicates that in future rail transport will be used for long distances and belt conveyors for handling within open-pit mining site; discussion is focused on measure to increase train capacity without increasing train length, introduction of four-rail tracks (with standard gage in center) for cars of capacity of about 240 cu m; more powerful locomotives or multiple-traction will be necessary, and also faster train sequence through automatically controlled train operation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Massentransport im Tagebaubetrieb


    Additional title:

    Massentransport im Tagebaubetrieb


    Contributors:
    Goergen, H. (author)

    Published in:

    Foerdern und Heben ; 17 , n 14 ; p 802-806


    Publication date :

    1967


    Size :

    5 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German




    Massentransport mit grossvolumigen Muldenkippern

    Faun-Werke,Lauf | Automotive engineering | 1979




    Beschreibung numerischer Vefahren zur Auswertung experimenteller Untersuchungen ueber d. Massentransport bei d. Kristallisation ternaerer Legierungen.

    Tensi,H.M. / Heyde,H. / Inst. f. Werkstoff- und Verarbeitungswiss. d. TU Muenchen | Automotive engineering | 1975