Mass transportation on open-pit mining sites; comparison of advantages and disadvantages of rail transport and belt handling indicates that in future rail transport will be used for long distances and belt conveyors for handling within open-pit mining site; discussion is focused on measure to increase train capacity without increasing train length, introduction of four-rail tracks (with standard gage in center) for cars of capacity of about 240 cu m; more powerful locomotives or multiple-traction will be necessary, and also faster train sequence through automatically controlled train operation.
Massentransport im Tagebaubetrieb
Massentransport im Tagebaubetrieb
Foerdern und Heben ; 17 , n 14 ; p 802-806
1967
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Massentransport mit grossvolumigen Muldenkippern
Automotive engineering | 1979
|Massentransport-Prozesse in der Flüssigkeits-Chromatographie
TIBKAT | 1968
|Kuppelbares bodengleitendes Sessel-Seilkarussell zB. zum innerstädtischen Personen-Massentransport
European Patent Office | 2024
|