129 km long canal connecting Liege with Antwerp is 36 yr old; as its traffic has increased by 300% since its opening, and existing locks permit navigation of barges of 600 ton maximum capacity only, plans are discussed for increasing its potential; this would comprise deepening of channel, enlarging locks, and modernizing port installations.
Why Albert Canal requires modernization
Pourquoi moderniser le Canal Albert
1963
32 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1941
Engineering Index Backfile | 1939
Effective station modernization requires careful planning
Engineering Index Backfile | 1943
POWER GENERATION - Changing Times Requires Plant Modernization
Online Contents | 2005
Albert canal repaired for war traffic
Engineering Index Backfile | 1945
|