Details of service on New York Central Railroad now operating two 3000-kw mercury-arc rectifiers, one of which was installed in 1931 in Wakefield substation, and other in 1933 in new substation located at North White Plains; section through 3000-kw rectifier made by International General Electric Co of Schenectady shown.
North American rectifier practice
Elec Ry Traction (Supp Ry Gaz)
1935
4 pages
Load chart
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.