Program includes: new outer harbor and deep-water entrance; embarkation mole in tidal harbor for passenger traffic; new entrance lock; floating dock of 20,000 tons lifting capacity; construction of new canal to provide for inland waterway drainage; illustrated description. (See also - n 4131 Mar 15 1935 p 279-81)
New harbour works at Dunkirk
Engineer
Engineer ; 159 , n 4132
1935
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Works on new basin of port of Dunkirk
Engineering Index Backfile | 1961
|British Library Online Contents | 2019
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1935
Engineering Index Backfile | 1935