Use of welded Cromansil steel in first of high-speed, streamlined trains built for Union Pacific System by Pullman Car and Mfg Corp, on "Zephyr", built by E. G. Budd Mfg Co for Chicago, Burlington and Quincy, and in three new detector cars for Sperry Rail Service.
Welded Cromansil structures in railway service
Ry Mech Engr
Railway Mechanical Engineer ; 109 , n 1
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Continuously Welded Rails (CWR) in elevated railway structures
British Library Conference Proceedings | 2003
|Engineering Index Backfile | 1950
|Engineering Index Backfile | 1969
|Engineering Index Backfile | 1949
|