Installation of new search light-type automatic block signals to replace two-arm lower-quadrant semaphores on 11 mi of 4-track road, between Ridgewood, N J, and Suffern, in which train speeds are increased and delays reduced. (See also Ry Signaling v 28 n 6 June 1935 p 300-2 and 304)
New automatic signals increase track capacity and safety on Erie
Ry Age
Railway Age ; 98 , n 20
1935
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New automatic signals increase track capacity and safety on Erie
Engineering Index Backfile | 1935
Erie increases track capacity on busy section of double track
Engineering Index Backfile | 1931
How signals can increase track capacity
Engineering Index Backfile | 1918
|Engineering Index Backfile | 1887
New automatic block signals on the Erie railroad
Engineering Index Backfile | 1908