Apr 5: Design of wind tunnels; velocity; density of air composing currents; new employment of tunnels for full-size machines; tunnel at Royal Aircraft Establishment, South Farnborough. Apr 12: Arrangement of building. May: Main aerodynamic balance. May 17: Model balances; balance cars and lift; winding machinery. May 24; Fan drive; electric equipment, etc. (See also Engineer v 159 n 4134 Apr 5 1935 p 351-353, n 4135 Apr 12 p 380-382, n 4138 May 3 p 468-471, n 4140 May 17 p 517-518; n 4141 May 24 p 534-537; Aeroplane v 48 n 1246 Apr 10 1935 p 415-6; Flight v 27 n 1372 Apr 11 1935 p 380-383; and Concrete and Constr Eng v 30 n 5 May 1935 p 293-296.)
Twenty-four-foot wind tunnel at Farnborough
Engineering
Engineering ; 139 , n 3613
1935
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Twenty-four-foot wind tunnel at Farnborough
Engineering Index Backfile | 1935
Twenty-four-foot wind tunnel at farnborough
Engineering Index Backfile | 1935
Twenty-four-foot wind tunnel at Farnborough
Engineering Index Backfile | 1935
No. 19 wind tunnel at Farnborough
Engineering Index Backfile | 1955
|The No. 19 Wind Tunnel at Farnborough
Emerald Group Publishing | 1955
|