All present airports and airport terminal facilities in design stage and presently under construction will be unsuitable for super jets; proposal of designing approximately 2 mi landing strip, 1 or 2 mi long taxiway, with passengers, baggage and some freight on one side, and air freight only on other side; it is envisaged that jumbo jet will turn 90° and insert forward part of fuselage into recess of departure lounge or freight terminal.
Super-jets demand new planning
Pac Bldr and Engr
Pacific Builder and Engineer ; 73 , n 8
1967
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2001
Jets demand lower landing minimums
Engineering Index Backfile | 1954
|Minimizing Risks in Super-Light Jets
British Library Online Contents | 2003
|Super Midsize Jets - Die goldene Mitte
Online Contents | 2011
Historie -- Super-Jets - Airbus A380 - Rekordriese
Online Contents | 2006