Airport Master Plan adopted by City and functional concepts to establish criteria for design of new terminal are discussed; under unit terminal concept, separate unit terminals will be placed in single line in mall arrangement; each unit terminal may have four Flight Stations, each with five gates for aircraft for total of 20 aircraft gates per unit terminal; in first phase of construction, two unit terminals are being built; parking accommodations for public automobiles will be provided on garage floors on three upper levels of each of unit terminals and on open areas located between terminal buildings.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Plans for New Houston intercontinental airport


    Additional title:

    ASCE-AOCI Specialty Conference


    Contributors:

    Conference:

    ASCE-AOCI Specialty Conference -- Airport Terminal Facilities ; 1967 Planning



    Publication date :

    1967


    Size :

    20 pages


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English


    Keywords :


    Engineered construction at Houston intercontinental airport

    Fischer, H.O. / Newnam, Jr., F.H. | Engineering Index Backfile | 1965



    STOL Operations and Facilities at Houston Intercontinental Airport

    Foster, Joseph A. | SAE Technical Papers | 1974



    The Above-Ground People Mover at Houston Intercontinental Airport

    Newton, C. A. / Casselman, D. M. / American Society of Civil Engineers; Urban Transportation Division; Committee on Automated People Movers | British Library Conference Proceedings | 1998