The subject of the article is the time-cost analysis of the risk of actions taken in the reconstruction of technical infrastructure (in particular housing) in the areas after the disaster on the example of Syria. As a result of the analysis of actions taken at the reconstruction of the technical (housing) infrastructure in the areas after the disaster, an attempt was made to identify the inconveniences in the management of the risk of targeted activity after the incident. Requests for efficient planning of technical (residential) infrastructure projects have been developed, including foreseeable future natural hazards.
The Concept of Risk Analysis of Actions Taken in the Reconstruction of Technical Infrastructure in the Areas After the Disaster on the Example of Syria
2020
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
The Intelligent Transport System Concept for Post - Disaster Infrastructure Under Reconstruction
British Library Conference Proceedings | 2019
|Economic reconstruction in Syria proceeds slowly
Engineering Index Backfile | 1930
|