In the paper the outcomes of operations performed on the proving track section of Lviv Railways aimed at estimating the possibility of exclusion of pneumatic braking on the section Lavchne–Beskyt–Volovets as well as the possibility of exclusion of an engineering stop at the platform Skotarske from the train schedule are observed.


    Access

    Download


    Export, share and cite



    Title :

    Estimate of the possibility of the track capacity increase of the section Lavochne–Beskyt–Volovets at the expense of intensive application of regenerative braking system saurt-bars


    Contributors:
    V.V. Arsonov (author) / I.V. Bilan (author) / I.S. Grunic (author) / V.L. Gorobets (author) / L.V. Ursulyak (author) / A.P. Taturevich (author)


    Publication date :

    2012



    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown