General data on the network of Ukrainian highways are presented. The analysis of design methods of highway reconstruction based on the theory of traffic flows and economic calculations of its repay time is made. The relationship between traffic intensity and speed is shown by considering the theory of traffic flows. The methods, taking into account the principle of effectiveness of highway reconstruction based on its repay time, are discussed.


    Access

    Download


    Export, share and cite



    Title :

    The criteria describing the need for highway reconstruction based on the theory of traffic flows and repay time


    Contributors:
    A. Beljatynskij (author) / N. Kuzhel (author) / O. Prentkovskis (author) / O. Bakulich (author) / I. Klimenko (author)


    Publication date :

    2009



    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown




    The criteria describing the need for highway reconstruction based on the theory of traffic flows and repay time

    Andrey Beljatynskij / Nina Kuzhel / Olegas Prentkovskis et al. | DOAJ | 2009

    Free access

    THE CRITERIA DESCRIBING THE NEED FOR HIGHWAY RECONSTRUCTION BASED ON THE THEORY OF TRAFFIC FLOWS AND REPAY TIME

    Beljatynskij, A. / Kuzhel, N. / Prentkovskis, O. et al. | British Library Online Contents | 2009




    Describing Air Traffic Flows Using Stochastic Programming

    Lee, K. / Delahaye, D. / Puechmorel, S. et al. | British Library Conference Proceedings | 2009