The age of currently operated concrete airfield pavements in Poland exceeds 30 years operation period many times. Such a long working life of airfield pavements forced to search for the efficient and fast technologies of their reconstruction. The article described in detail the technologies of fast reconstruction of airfield concrete slabs using prefabricated slabs. The addressed technology guarantees the reconstruction and even the improvement of the condition of loadbearing capacity of mentioned airfield slabs which was confirmed during laboratory tests, field tests and practically verified in the real operation in the International Airport Kraków-Balice.
Reconstructing the Load-Bearing Capacity of Deteriorated, Concrete Airfield Pavements Using Prefabricated Slabs
2018
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Rubblizing Concepts - Heavy Load Concrete Airfield Pavements
British Library Conference Proceedings | 2001
|British Library Conference Proceedings | 1999
|State-of-the-Practice: Rubblization of Heavy Load Concrete Airfield Pavements
British Library Conference Proceedings | 2003
|