In this article the results of construction and reconstruction of railway sections to ensure the spatial connectivity of the regions of the country and integration into the global transport space are considered. The use of a systematic approach for selecting the most rational methods of quantitative and qualitative analysis of construction and reconstruction of railway sections is proposed. The basic characteristics and stages of construction and reconstruction of railways in Uzbekistan are given. The indicators of new railway sections construction, construction and reconstruction of railway sections for speed and high-speed trains movement during the period of Uzbekistan’s independence have been analysed. When analysing the indicators the quantitative estimation by length, total cost and cost per kilometre of large investment projects, realized during Uzbekistan's independence years have been used.


    Access

    Download


    Export, share and cite



    Title :

    Quantitative characteristics of construction and reconstruction of railway sections in Uzbekistan


    Contributors:


    Publication date :

    2023




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown




    System of preparing the personnel for railway of Uzbekistan

    Abdullaaziz ARTIKBAEV / Marufdjan RASULOV / Makhamadjan MIRAKHMEDOV | DOAJ | 2013

    Free access

    Uzbekistan

    Online Contents | 2008


    Uzbekistan

    Online Contents | 1994


    Uzbekistan

    Online Contents | 1996


    Uzbekistan . Vietnam

    Online Contents | 2010