The purpose of this document is to present evidence of the work carried out as part of the flight validation activities of the RNAV approach involving the instrument flight procedures (IFPs), down to the localizer performance with vertical (LPV) minima, for RWY27 at Katowice Airport (EPKT). The presented material constitutes the second part of the “Preflight validation RNAV GNSS approach procedures for EPKT in the EGNOS APV Mielec” project. The following issues were addressed: flight validation conditions, list of performed approaches, flight path analysis and pilot feedback.
RNAV GNSS FLIGHT VALIDATION APPROACH PROCEDURES FOR EPKT RWY27
2016
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
PRE-FLIGHT VALIDATION RNAV GNSS APPROACH PROCEDURES FOR EPKT IN „EGNOS APV MIELEC PROJECT”
DOAJ | 2016
|RNAV Instrument Approach Procedures
British Library Online Contents | 2004
|Advanced RNAV Procedures on the Horizon
British Library Online Contents | 2005
|