The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west–south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane … etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west–south wind farm.


    Access

    Download


    Export, share and cite



    Title :

    Comparative evaluation of different offshore wind turbine installation vessels for Korean west–south wind farm


    Contributors:


    Publication date :

    2017




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown






    Offshore wind turbine installation ship and offshore wind turbine installation method

    ZHANG WENYAO / FENG JINJIE / MA JIN et al. | European Patent Office | 2022

    Free access

    Offshore wind turbine installation

    ROODENBURG JOOP / WIJNING DIEDERICK BERNARDUS / BEREZNITSKI ALEXEI et al. | European Patent Office | 2016

    Free access