[Objective] To achieve non-stop aviation during the construction of a large-diameter shield tunnel crossing the airport flight zone in karst area, it is essential to study the construction scheme with non-stop aviation. [Method] Based on the construction of the No.2 and No.3 underpasses of the Phase III expansion project of Guangzhou Baiyun International Airport, the obstacle restrictions and runway land subsidence control requirements for non-stop aviation in airport flight zone are analyzed, and control standards for the runway area of this project are proposed. Combining the geological characteristics of engineering in karst area, a construction scheme for shallow-buried large-diameter shield tunnels is proposed. A three-dimensional refined numerical model is established to analyze the impact of shield tunneling on airport runway and validate the feasibility of the construction scheme. [Result & Conclusion] Efforts should be made to avoid tunneling into tunnel bottom bedrocks and meet the tunnel overall anti-floating requirements. Measures to increase shield tunnel overall stiffness should be taken to minimize the impact on airport operations to the greatest extent. The research results indicate that the design of tunnel crossing airport flight area mainly considers the impact of runway subsidence on aircraft operation safety during tunnel construction, so the runway subsidence control standard is set at the total subsidence within 30 mm, with a maximum differential subsidence rate not exceeding 1‰. According to numerical analysis results, the maximum subsidence of the airport runway during shield tunnel construction is 15.48 mm, with the maximum differential subsidence rate of 0.20‰, meeting the requirements for airport runway subsidence limits.


    Access

    Download


    Export, share and cite



    Title :

    Construction Scheme with Non-stop Aviation for Large-diameter Shield Tunnel Crossing Airport Flight Zone in Karst Area


    Contributors:
    Yuhang YE (author) / Xu LUO (author) / Jianmei LIU (author) / Wentian XU (author) / Yuehua LIANG (author)


    Publication date :

    2024




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown




    Comprehensive treatment construction method for tunnel crossing large karst cave

    GAO XUESHAN / LIANG ZHILIN / HUANG JINSEN et al. | European Patent Office | 2024

    Free access


    Airport flight area crossing safety intelligent control method and system

    SUN CHUANFENG / WANG HUI / ZHANG HAILI et al. | European Patent Office | 2024

    Free access

    Analysis of subgrade settlement in large-diameter-section curved shield tunnel undercrossing construction

    Lu, Jian / Yu, Jinghong / Zheng, Xuan et al. | British Library Conference Proceedings | 2022


    Liftable hanging basket type construction platform for freezing drilling of super-large-diameter shield tunnel

    WANG LEI / CHEN HONGLEI / XU SHURONG et al. | European Patent Office | 2023

    Free access