In transport systems, all equipment requires maintenance, which directly affects the machine’s availability and consequently the planned transport schedule. The purpose of this paper is to carry out a method for integrating recovery jobs in railway systems. The proposed method allows the insertion of preventive and corrective maintenance operations when the transport equipment is available in order to minimize periods of inactivity, avoid catastrophic scenarios, and maintain stability and safety of the studied networks. A computing algorithm, allowing insertion of the planned recovery tasks in periods of metro availability, without changing the initial scheduling solution, is established. Finally, we illustrate the implementation of the proposed approach on Tunisian Sahel railway transport networks.


    Access

    Download


    Export, share and cite



    Title :

    Static Integration Based on Stochastic P-Time Petri Nets of Maintenance Scheduling for Railway Transport Equipment


    Contributors:


    Publication date :

    2021




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown





    Stochastic petri nets for risk assessment

    Rafrafi, M. / Bourdeaudhuy, T. / El-Koursi, E.M. | Tema Archive | 2008


    Simulation of railway stations based on hybrid Petri nets

    Kaakai, Fateh / Hayat, Said / Moudni, Abdellah El | Tema Archive | 2006


    INVESTIGATION OF THE PARAMETERS OF RAILWAY STATIONS USING PETRI NETS

    Y. B. Demchenko / V. V. Malashkin / I. Y. Skovron | DOAJ | 2020

    Free access