This article explores in detail the problems associated with the digitization of train and shunting work at railway stations. Based on the analysis of the indicators of the use of the “Ch” station under the JSC “Uzbekistan Railways”, the factors that negatively affect the development of the digitization stages have been studied. A daily executed work-plan graph of the sorting station was also studied in real-time conditions. It found that the finished contents would remain standing at the station departure park for an average of 4 hours or more. One of the main reasons for this was the insufficient capacity of the adjacent station to handle trains. The station staff were therefore shown to be making possible the formation of “abandoned trains”. Recommendations were made to introduce a digitized complex system to improve train and shunting operations at railway stations. The functional capabilities of the proposed system were analyzed. Key words: railway station, loading of station, “abandoned train”, station daily executed work-plan graph, sorting hump capacity, digitized system, functional capacity, software.


    Access

    Download


    Export, share and cite



    Title :

    Digital design trends of train and shunting operations at railway stations




    Publication date :

    2024




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown




    Shunting of Passenger Train Units in a Railway Station

    Freling, Richard | Online Contents | 2005


    Shunting of Passenger Train Units in a Railway Station

    Freling, R. / Lentink, R. M. / Kroon, L. G. et al. | British Library Online Contents | 2005


    Automatic train approaching alarm system of railway shunting yard

    AN SHIHUA / LIAN XINGKUI / CHEN ZHIGANG et al. | European Patent Office | 2015

    Free access

    RAILWAY SHUNTING SYSTEM

    RADZISZEWSKI PAWEL / KUBLIN TOMASZ / OLESZCZUK JAN et al. | European Patent Office | 2024

    Free access