In order to prevent social instability of rail transit construction projects effectively, 15 factors caused rail transit social risk were extracted. Using the integration of decision-making trial and evaluation laboratory (DEMATEL) and the interpretive structure model(ISM), a structural model of risk cause system was established. The causes were divided into 4 categories: root causes, controllable causes, key causes, direct causes. The results show that safeguarding the fundamental interests of the masses is the key to control the social risk of the rail transit construction.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Analysis of Social Risk Causes of Rail Transit Construction Projects Based on DEMATEL-ISM


    Contributors:
    Song, Shuangshuang (author) / Zuo, Zhongyi (author) / Cao, Yi (author) / Wang, Lei (author)

    Conference:

    Fifth International Conference on Transportation Engineering ; 2015 ; Dailan, China


    Published in:

    ICTE 2015 ; 1868-1875


    Publication date :

    2015-09-25




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English





    Analysis of Influencing Factors of Urban Rail Transit Dispatching Based on Fuzzy DEMATEL-ISM

    Wang, Yitong / Wang, Yanhui | British Library Conference Proceedings | 2022


    LACTC Specialized Rail Transit Projects

    Crawley, J. E. / American Society of Civil Engineers / Air Transport Division | British Library Conference Proceedings | 1995