A five-step controlling method in the construction of cement-emulsified asphalt mortar (CA mortar) at Wuhan-Guangzhou Railway Passenger Dedicated Line (WGRPDL) is presented. The gathered data of the temperature, the construction rate, the fluidity and the air content of CA mortar are also analyzed. Results showed that the controlling method was effective in the construction management and the temperature had serious impact on the construction rate. Results also showed that the fluidity and air content of CA mortar almost had the same relative standard deviation; moreover, the two factors seemed to have linear relationships.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    CA Mortar Construction of the Trial Section of Wuhan-Guangzhou Railway Passenger Dedicated Line


    Contributors:
    Zeng, Xiaohui (author) / Xie, Youjun (author) / Deng, Dehua (author) / Zheng, Keren (author) / He, Zhimin (author)

    Conference:

    Second International Conference on Transportation Engineering ; 2009 ; Southwest Jiaotong University, Chengdu, China



    Publication date :

    2009-07-29




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English




    CA Mortar Construction of the Trial Section of Wuhan-Guangzhou Railway Passenger Dedicated Line

    Zeng, X. / Xie, Y. / Deng, D. et al. | British Library Conference Proceedings | 2009


    Wuhan-Guangzhou passenger-dedicated line

    Studiengesellschaft für den kombinierten Verkehr e.V. | IuD Bahn | 2006