On single-track rail corridors, meets between trains are a significant source of train delay. From the stopping train’s perspective, a meet can be divided into three distinct phases: braking into a siding, waiting for higher-priority trains to pass, and accelerating to operating speed on the main track. Meet delay can be further divided into fixed and variable components depending on the number of trains partaking in the meet. Advanced train control systems incorporating moving blocks and innovative dispatching strategies such as train fleeting promise to reduce minimum meet times. Using a spreadsheet-based calculation, it was found that train fleeting distributes fixed delays among more train conflicts, resulting in more efficient conflict resolution. Complementarily, moving blocks minimize variable delays. Combining moving blocks and fleeting can be highly effective, producing the lowest meet delay across a variety of track speeds and dispatching strategies. The results from this study can help railway practitioners evaluate the benefits of train fleeting, moving blocks, shorter train lengths, and extended fleet-length sidings when developing operating and capital plans.
Potential for Moving Blocks and Train Fleets to Enable Faster Train Meets on Single-Track Rail Corridors
2020-05-31
Article (Journal)
Electronic Resource
Unknown
Inductive rail heating head for a moving-point train track rail and a fixed train track rail
European Patent Office | 2020
|Development of hybrid optimization of train schedules model for N-track rail corridors
Online Contents | 2016
|Air train moving rail, air train turnout and air train rail beam
European Patent Office | 2022
|IMECE2002-33252 Tram-Train: Mixed Use of Rail Corridors
British Library Conference Proceedings | 2002
|