The Seattle Multimodal Terminal at Colman Dock provides pedestrian and vehicular ferry service throughout the Puget Sound. The existing facility is a pile supported trestle deck with three ferry slips and a terminal building. The project involved replacing the old seismically vulnerable trestle and terminal building while maintaining an operating facility. Washington State Ferries, the project owner, utilized a general contractor/construction manager (GC/CM) delivery method, creating a shared outlook for owner, designers, and contractor. Washington State Ferries chose WSP and KPFF Consulting Engineers as the design team and selected the Hoffman/Pacific Pile and Marine Joint Venture as the contractor.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Seattle Multimodal Terminal at Colman Dock Project Capacity Management and Planning


    Contributors:

    Conference:

    16th Triennial International Conference ; 2022 ; Honolulu, Hawaii


    Published in:

    Ports 2022 ; 612-620


    Publication date :

    2022-09-15




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English



    Geotechnical and Structural Challenges: New Seattle Multimodal Terminal at Colman Dock Project

    Bayrak, M. Birkan / Mikhail, Reda / Wray, Mike et al. | TIBKAT | 2019


    New colman dock at Seattle

    Estep, Cole H. | Engineering Index Backfile | 1908



    Dock capacity

    Hare, T.B. | Engineering Index Backfile | 1930


    Dock capacity

    Hare, T.B. | Engineering Index Backfile | 1930