A new model to resolve the problems in resources leveling under fixed time is presented. The model based on the latest finished time-scaled network diagram presents the highest priority with the change value of minimum variance between resource demand before and after moving when a node have many non-key-work-process. An example demonstrates the model can reduce the quantity of optimization work.
A New Model of Resources Leveling Based on the Latest Finished Time-Scaled Network Diagram
Second International Conference on Transportation Engineering ; 2009 ; Southwest Jiaotong University, Chengdu, China
2009-07-29
Conference paper
Electronic Resource
English
A New Model of Resources Leveling Based on the Latest Finished Time-Scaled Network Diagram
British Library Conference Proceedings | 2009
|Optimized traffic flow prediction model based on space-time diagram convolutional network
European Patent Office | 2021
|MODEL AIRCRAFT Scaled ambition
Online Contents | 2010