The Cassini space probe requires 180 238 Pu Light-weight Radioisotopic Heater Units (LWRHU) and 216 238 Pu General Purpose Heat Source (GPHS) pellets. Additional LWRHU and GPHS pellets required for non-destructive (NDA) and destructive assay purposes were fabricated bringing the original pellet requirement to 224 LWRHU and 252 GPHS. Due to rejection of pellets resulting from chemical impurities in the fuel and/or failure to meet dimensional specifications a total of 320 GPHS pellets were fabricated for the mission. Initial plans called for LANL to process a total of 30 kg of oxide powder for pressing into monolithic ceramic pellets. The original 30 kg commitment was processed within the time frame allotted; an additional 8 kg were required to replace fuel lost due to failure to meet Quality Assurance specifications for impurities and dimensions. During the time frame allotted for pellet production, operations were impacted by equipment failure, unacceptable fuel impurities levels, and periods of extended down time, >30 working days during which little or no processing occurred. Throughout the production process, the reality of operations requirements varied from the theory upon which production schedules were based.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    The Cassini project: Lessons learned through operations


    Contributors:

    Conference:

    Space technology and applications international forum - 1998 ; 1998 ; Albuquerque,New Mexico (USA)


    Published in:

    AIP Conference Proceedings ; 420 , 1 ; 1173-1178


    Publication date :

    1998-01-15


    Size :

    6 pages





    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English




    The Cassini Project: Lessons Learned Through Operations

    McCormick, E. D. / University of New Mexico; School of Engineering; Institute for Space and Nuclear Power Studies | British Library Conference Proceedings | 1998




    2.1105 Cassini Risk Management During Mission Operations and Data Analysis - Application & Lessons Learned