Continuously growing air traffic density, mainly over Europe and the U.S., introduces a need for new concepts in air traffic control. One of such new concepts involves air traffic management using four-dimensional contracts. According to this approach, all the air traffic is preplanned and optimized in advance in four dimensions: three-dimensional location and time. Before takeoff, each aircraft is given a flyable conflict-free four-dimensional flight plan, called a four-dimensional contract. The aircraft is committed to comply with its contract during the entire flight. Whenever an aircraft cannot respect its prescribed four-dimensional contract, a new one should be recomputed for it. New contract computation is performed when the aircraft are airborne and, therefore, should be completed in a matter of minutes. The paper introduces an algorithm for replanning of four-dimensional contracts within the mentioned time limitation. The update task is treated as an optimization problem minimizing the influence of the contract change on the surrounding traffic. To increase the efficiency of the algorithm, only the neighboring traffic is considered during the replanning process. Numerical examples are presented to demonstrate the capabilities and performance of the proposed algorithm.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Tactical Replanning Algorithms for Four-Dimensional Contracts in Air Traffic Control


    Contributors:
    Gekht, Daphna (author) / Idan, Moshe (author)

    Published in:

    Publication date :

    2014-04-17


    Size :

    13 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English





    Tactical Contracts Re-Planning in 4D Air-Traffic Control

    Gekht, D. / Idan, M. / Tekhniyon, Makhon tekhnologi le-Yisra'el | British Library Conference Proceedings | 2013


    Airborne Tactical Information Management System In-Cockpit Mission Replanning and Rehearsal (ATIMS/ICMRR)

    Storer, M. / Logan, R. / Yu, C. et al. | British Library Conference Proceedings | 1994


    Dynamic Replanning System

    Porta, Harry J. | NTRS | 1988


    An object-oriented information system for railway traffic replanning

    Missikoff, M. / Toiati, M. / Association of American Railroads| Railway Technical Research Institute, Japan | British Library Conference Proceedings | 1994