Compressor stability, aeroelasticity, steady/unsteady viscous calculation methods, active noise reduction, multi-stage compressor, optimisation algorithms, secondary flows
Hochtemperatur-Gasturbine (HTGT): Teilverbundvorhaben: Turbotech II : Abschlußbericht ; Laufzeit: 01.04.1996 - 31.12.2000
Turbotech II
Verbundprojekt: Hochtemperatur - Gasturbine (HTGT)
HTGT-Turbotech II: final report on MTU's projects
[Elektronische Ressource]
2001
Online Ressource, [274] p. = 17,4 Mb., text and images
ill., graphs
Contract BMBF 0327040 J. - Differences between the printed and electronic version of the document are possible. - nIndex p. [273] - [274]. - Engl. title: HTGT-Turbotech II: final report on MTU's projects
Digital preservation by Technische Informationsbibliothek (TIB) / Leibniz-Informationszentrum Technik und Naturwissenschaften und Universitätsbibliothek
Report
Electronic Resource
German
BKL: | 52.30 Strömungskraftmaschinen, Turbomaschinen |
Filmgekühlte Turbinenplattformen : HTGT-TURBOTECH II Vorhaben 1.327, Schlußbericht
TIBKAT | 2001
|