Total Completion Time in a Two-machine Flowshop with Deteriorating Tasks
JOURNAL OF MATHEMATICAL MODELLING AND ALGORITHMS ; 6 , 4 ; 563-576
2007-01-01
14 pages
Article (Journal)
English
DDC: | 003.3 |
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Routing Two-Machine Flowshop Problems on Networks with Special Structure
British Library Online Contents | 1996
|Scheduling for flowshop problem
British Library Online Contents | 1995
|Routing Two-Machine Flowshop Problems on Networks with Special Structure
Online Contents | 1996
|Lot Streaming Heuristics for the M-Machine No-Wait Flowshop
British Library Conference Proceedings | 1998
|