An assessment of sluicing rockfill material at the main dam of the Xiaolangdi project in China
DAM ENGINEERING ; 9 , 2 ; 111-122
1998-01-01
12 pages
Article (Journal)
English
DDC: | 627.4 |
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Progress at Xiaolangdi: China's key project on the Yellow river
Online Contents | 1998
Unusual solution for the slurry trench cutoff wail at Xiaolangdi
Online Contents | 1998
|ROCKFILL DAMS - Recognizing milestone achievements in rockfill dam engineering
Online Contents | 2010
Sediment Management Option by Sediment Sluicing in the Mimi River, Japan
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2016
|Mcira Rockfill Dam, Indonesia: The Role of Rockfill, Soil and the Re-use of Cofferdam Material
British Library Online Contents | 1995
|