Subsidence and soil reinforcement in line 8, extension Madrid Metro
Conference; 2nd, Soil structure interaction in urban civil engineering; planning & engineering for the cities of tomorrow ; 2002 ; Zurich, Switzerland
2002-01-01
6 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Tema Archive | 1997
|Madrid chooses CBTC for two metro line
IuD Bahn | 2005
Engineering Index Backfile | 1919
Madrid metro expansion continues
British Library Online Contents | 2004
Metro Madrid: deserving of "Most Improved Metro" award
IuD Bahn | 2008
|