The Effect of a Level Crossing Upgrade on Signaller Workload and Staffing Requirements: A Case Study
2nd, European Rail Human Factors Conference; People and rail systems: human factors at the heart of the railway ; 2005 ; London, England
2007-01-01
8 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Prediction of Signaller Workload
British Library Conference Proceedings | 2007
|Automation in Railway Operations: Effects on Signaller and Train Driver Workload
German Aerospace Center (DLR) | 2018
|