Travel Time Variability after a Shock: The Case of the Twin Cities Ramp Meter Shut Off
1st, International Symposium on Transportation Network Reliability; The network reliability of transport: (INSTR) ; 2001 ; Kyoto, Japan
2003-01-01
18 pages
Includes bibliographical references
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Traffic Equilibration: The Case of the Twin Cities Ramp Meter Shut Off
British Library Conference Proceedings | 2002
|Twin Cities Ramp Meter Evaluation, Final Report
NTIS | 2001