Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Integrated project and process portal - success factor for SPICE level 3 Resolving the contradiction between standardization and flexibility


    Contributors:
    Seidt, S. (author) / Dornseiff, M. (author)

    Conference:

    International congress; 12th, Electronic systems for vehicles ; 2005 ; Baden-Baden, Germany



    Publication date :

    2005-01-01


    Size :

    14 pages


    Remarks:

    Also held on CD-ROM. Text in German or English. Includes bibliographical references.




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    German




    Flexibility in high volume production - a contradiction?

    Neubert,W. / McKinsey,GB | Automotive engineering | 2003


    Standardization and innovation: Dissolving the contradiction with modular production architectures

    Kampker, Achim / Maue, Andreas / Deutskens, Christoph et al. | IEEE | 2014


    Flexibility and Automation in Automotive Production- Contradiction or Challenge?

    Rottlaender,H.P. / Audi NSU Auto Union,DE | Automotive engineering | 1984


    Flexibility is key to FLNG project success

    Talib, J. / Hoffart, S.D. / Bartel, W.L. | Tema Archive | 2014


    Utility Vehicles “Standardization/Modularity/Flexibility”

    Goill, Larry | SAE Technical Papers | 1994