Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Initial Closed Operation of the CELSS Test Facility Engineering Development Unit



    Conference:

    F0.1 and F1.3-F2.3 Symposia, Space life sciences: missions to Mars, radiation biology, and plants as a foundation for long-term life support systems in space ; 2000 ; Warsaw



    Publication date :

    2003-01-01


    Size :

    8 pages


    Remarks:

    Held during the 33rd COSPAR scientific assembly



    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Kliss, M. / Blackwell, C. / Zografos, A. et al. | NTRS | 2003



    Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Kliss, M. / Blackwell, C. / Zografos, A. et al. | Elsevier | 2002


    Preliminary Test Results from the CELSS Test Facility Engineering Development Unit

    Kliss, M. / MacElroy, R. D. / Blackwell, C. C. et al. | British Library Conference Proceedings | 1994


    Preliminary test results from the CELSS Test Facility Engineering Development Unit

    Kliss, Mark H. / Macelroy, R. D. / Blackwell, C. C. et al. | NTRS | 1994