Breakdown-Related Capacity for Freeway with Ramp Metering
Session, Advanced traffic management systems and vehicle-highway automation; highway operations, capacity and traffic control ; 2001 ; Washington, DC
Advanced traffic management systems and vehicle-highway automation; highway operations, capacity and traffic control ; 1748 ; 110-115
2001-01-01
6 pages
Held as part of the 80th annual meeting of the Transportation Research Board
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Breakdown-Related Capacity for Freeway with Ramp Metering
Online Contents | 2001
|Breakdown-Related Capacity for Freeway with Ramp Metering
Transportation Research Record | 2001
|Ramp metering and freeway bottleneck capacity
Online Contents | 2010
|Freeway Optimization Utilizing Ramp Metering
British Library Conference Proceedings | 1994
|Freeway ramp metering: an overview
IEEE | 2000
|