Synonyme wurden verwendet für: Geomechanics
Suche ohne Synonyme: journal:(Geomechanics and Tunnelling)

1–20 von 74 Ergebnissen
|

    A9 Bosruck Tunnel - design approaches for swelling rock

    Lenz, Franz / Marcher, Thomas / Neumayr, Thomas | Tema Archiv | 2010

    A road tunnel in difficult geology with cross-sections up to 300 m2

    Längle, Thomas / Käppeli, Lukas | Tema Archiv | 2010

    Ausbau der Westbahn zur Viergleisigkeit: Erfahrungen in der Wahl der Tunnelbaumethode

    Bauer, Franz / Hödl, Reinhold / Koinig, Josef et al. | Tema Archiv | 2011

    Austrian tunnelling expertise connecting the Kashmir valley to India

    Holzleitner, Wolfgang / Kraft-Fish, Martin / Imre, Bernd et al. | Tema Archiv | 2013

    Baumethodenentscheidung bei der Asfinag

    Schreitl, Bernhard / Schröfelbauer, Thomas / Wanker, Christoph et al. | Tema Archiv | 2011

    Bosruck tunnel second bore: a challenge for sequential tunnelling in various geological formations

    Pacher, Franz / Cottogni, Ingo / Stegbauer, Thomas | Tema Archiv | 2010

    Concepts to overcome squeezing geological conditions at the Koralm tunnel

    Wagner, Hanns / Handke, Dieter / Matter, Jürg et al. | Tema Archiv | 2009

    Construction of a cavern under an autobahn embankment for the Ceneri Base Tunnel

    Filippini, Raffaele / Kovari, Kalman / Rossi, Francesco | Tema Archiv | 2012

    Construction of the second bore of the Pfaender tunnel

    Westermayr, Helmut / Höllrigl, Michael / Wanker, Christoph et al. | Tema Archiv | 2009

    Contract LT33 Hofjagdstrasse - the central section of the Lainzer tunnel

    Czopak, Karl / Neumüller, Ekkehart | Tema Archiv | 2009

    Czech tunnelling abroad

    Stehlik, Ermin | Tema Archiv | 2013

    Design and execution of special foundation works for the deep excavations of the Thessaloniki Metro

    Vrettos, Christos / Vassilakopoulou, Georgia / Rizos, Dimitris | Tema Archiv | 2013

    Design of SCL structures in London

    Spyridis, Panagiotis / Nasekhian, Ali / Skalla, Gerald | Tema Archiv | 2013

    Development of underground construction engineering in the Czech Republik

    Bartak, Jiri / Hilar, Matous / Pruska, Jan | Tema Archiv | 2013

    Durchmesser Line, Zürich - section under the Südtrakt - Six years of construction for 130 m of tunnel

    Hessler, Nicolas / Ceriani, Marco / Grieder, Lukas et al. | Tema Archiv | 2012

    Durchmesserlinie Zürich, Weinbergtunnel - Herausforderung Lockergesteinsstrecke und Flussunterquerung

    Bosshard, Martin / Bolliger, Josef / Kobel, Roland | Tema Archiv | 2011