Passenger and freight train scheduling problem on double-track railway line is considered by using Ant Colony Optimization (ACO) algorithm. The aim is to reasonably arrange the dispatch sequence of the trains to minimize the total run time. The constrains in train scheduling problem are considered and the model is established. Due to the complexity of train scheduling problem, this problem is solved by ACO and implemented by programming. A case study is presented to illustrate the solution. The results illustrate that the proposed method is effective to solve the scheduling problem on double-track railway line.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    A Method for Generating the Timetable of Double-Track Railway Line



    Erschienen in:

    Applied Mechanics and Materials ; 347-350 ; 2501-2505


    Erscheinungsdatum :

    08.08.2013


    Format / Umfang :

    5 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Track layout and timetable of long double-track railway

    Zimmer, G. | Engineering Index Backfile | 1968


    Railway Timetable Optimization

    Reisch, Julian | TIBKAT | 2021

    Freier Zugriff

    Timetable planning system and timetable generating method

    MAEKAWA YUKI / SATO RYOTA / UEMATSU RYOTA et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    [Eastern Counties Railway timetable]

    Eastern Counties Railway Company | TIBKAT | 1847


    The GB Passenger Railway Timetable

    British Library Online Contents | 1997