The Trans Tokyo Bay (TTB) Highway project comprises a 9.5-km-long tunnel to the west and an 5.5-km-long bridge to the east. An average traffic volume of around 11,000 vehicles per day was observed at the end of October 1998, a year after the highway was opened to service. The general planning for the tunnel is discussed, focusing on the provision of safety features and facilities, as well as the public relations system for making drivers aware of these features.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Safety systems for the Trans-Tokyo Bay Highway tunnel project


    Beteiligte:
    Yamada, N. (Autor:in) / Ota, Y. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1999


    Format / Umfang :

    10 Seiten, 5 Quellen




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Die Tunnel des Trans-Tokyo-Bay Highway

    Maidl, B. / Gipperich, C. | Tema Archiv | 1994


    Trans-Tokyo highway

    Wallis, S. | Tema Archiv | 1994


    Design and construction of Trans-Tokyo Bay Highway

    Uchida, K. / Shioi, Y. / Arakawa, T. et al. | British Library Conference Proceedings | 1994


    Emergency facilities for the Trans Tokyo Bay tunnel

    Nakanishi, T. / Kajiwara, S. / Haga, H. et al. | British Library Conference Proceedings | 1998


    The Trans-Tokyo Bay Highway: Socioeconomic benefits and environmental measures

    Takahashi, M. | British Library Conference Proceedings | 1994