The concept of the new high performance locomotive BR101 for the DBAG is based on the modular system design of the EC02000 family. This article describes the design of its communication and control system with respect to the requirements of cost effective and efficient maintenance measurements, which are implemented in order to manage the short delivery times without major teething trouble obstacles and in order to achieve the guaranteed LCC values. The on-board diagnostic system is designed in accordance with the experiences of the ICE diagnostic system and the standards defined by UIC leaflet 557; it is supported by a central fleet management system connecting each locomotive via GSM. Thereby a big portion of preventive maintenance is no any longer dependent on limited flexibility of fixed installations for error detection and allocation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Communications and control system for fleet maintenance management of the DBAG locomotive BR101

    Gemmeke, K. / Kock, F. / Koopmann, E. et al. | British Library Conference Proceedings | 1998



    Locomotive Team Productivity as a Criterion for Optimal Locomotive Fleet Management

    Kotenko, Alexey / Kotenko, Oksana | Springer Verlag | 2022


    Locomotive Management : Cleaning-driving-maintenance

    Hodgson, James T. / Lake, Charles S. | TIBKAT | 1942


    Locomotive maintenance system

    WEI LAI | Europäisches Patentamt | 2015

    Freier Zugriff