In this paper we present a basic scheduling system (MAESTRO) designed to handle resource-constrained scheduling problems. We first discuss the basics of resource-constrained scheduling, highlighting how power is modelled as a constraining resource, and how it interacts in the system with other constraining resources. We then discuss the operation of the scheduling system, and several of the strategies which may be used, altering the criteria by which scheduling is performed. Different strategies produce different effects on the efficiency of the use of available power. Methods of handling power efficiency under different scenarios are discussed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Power and resource management scheduling for scientific space platform applications


    Weitere Titelangaben:

    Planung des Energie-und Resourcen-Managements fuer wissenschaftliche Anwendungen bei Weltraumplattformen


    Beteiligte:
    Geoffroy, A.L. (Autor:in) / Britt, D.L. (Autor:in) / Bailey, E.A. (Autor:in) / Gohring, J. (Autor:in)


    Erscheinungsdatum :

    1987


    Format / Umfang :

    5 Seiten, 1 Quelle


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Power and Resource Management Scheduling for Scientific Space Platform Applications

    Geoffrey, Amy L. / Britt, Daniel L. / Bailey, Ellen A. et al. | AIAA | 1987


    Scheduling and Resource Management System for Space Applications

    D. L. Britt / A. L. Geoffroy / J. R. Gohring | NTIS | 1988


    A scheduling and resource management system for space applications

    Britt, Daniel L. / Geoffroy, Amy L. / Gohring, John R. | NTRS | 1988


    SPACE-TIME RESOURCE AND SPACE-TIME PROCESS MANAGEMENT SYSTEM, AND FLIGHT SCHEDULING METHOD

    TANG YUQING / SUN JIAYANG / LI SHIPENG et al. | Europäisches Patentamt | 2025

    Freier Zugriff