There are numerous difficulties and risks in the construction of river-crossing tunnel of large-diameter metro. How to ensure the safety of the project and reduce the construction risk is the key issue requiring urgent solution. This paper, taking a project of constructing river-crossing tunnel of large-diameter metro as the research background, compared and selected the methods of constructing this river-crossing tunnel. Large-diameter slurry shield machine was recommended to conduct digging construction. Then, possible risks of the selected construction method were analyzed and summarized into two categories: risk concerning the project itself and environmental risk. Finally, corresponding measures to handle the risks were put forward.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Study on Construction Risk Analysis and Risk Counter-Measures of River-Crossing Tunnel of Large-Diameter Metro


    Beteiligte:
    Hu, Jun (Autor:in) / Zeng, Hui (Autor:in) / Wang, Xiao-Bin (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    4 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    A Three-Stage Dynamic Risk Model for Metro Shield Tunnel Construction

    Xu, Na / Guo, Chaoran / Wang, Li et al. | Springer Verlag | 2024


    A Three-Stage Dynamic Risk Model for Metro Shield Tunnel Construction

    Xu, Na / Guo, Chaoran / Wang, Li et al. | Springer Verlag | 2024


    Interim measures will reduce crossing risk

    Knutton, Mike | IuD Bahn | 2004


    Construction Challenges with a Large Diameter Tunnel

    Vazquez, Miguel / Biglen, Douglas / Haeckler, Christopher | ASCE | 2021