The North Texas Municipal Water District (NTMWD) provides water and wastewater services to more than 1.7 million people. NTMWD is constructing the first new major reservoir in Texas in nearly 30 years. The 16,641-acre lake is located 40 mi northeast of the Dallas-Fort Worth (DFW) Metroplex. The project includes a new reservoir, 90-in. raw water pipeline, water treatment plant, and an 84-in. treated water pipeline. The 84-in. treated water pipeline will transport potable water from the treatment plant near Leonard approximately 24-mi to McKinney. The treated water pipeline crosses multiple creeks, rivers, highways, and wetlands. One unique aspect of the pipeline includes a 2,500 ft section that crosses a forested wetland, river, railroad, and FEMA floodway. Access challenges, cost, and constructability concerns influenced the design approach for this area. This paper will discuss the design process used in conjunction with the Construction Manager at Risk (CMAR) for the 2,500 ft, 60-ft deep tunnel including vertical shafts, soils conditions, carrier pipe installation, construction approach, and tunneling methods. The authors will discuss the construction process and challenges incurred during tunneling.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Construction Challenges with a Large Diameter Tunnel


    Beteiligte:

    Kongress:

    Pipelines 2021 ; 2021 ; Virtual Conference


    Erschienen in:

    Erscheinungsdatum :

    29.07.2021




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Analysis of subgrade settlement in large-diameter-section curved shield tunnel undercrossing construction

    Lu, Jian / Yu, Jinghong / Zheng, Xuan et al. | British Library Conference Proceedings | 2022


    Large-diameter PE pipe mounting and consignment trolley in tunnel and construction method thereof

    ZHENG PING / CUI XUHUI / MA JINCHUAN et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Liftable hanging basket type construction platform for freezing drilling of super-large-diameter shield tunnel

    WANG LEI / CHEN HONGLEI / XU SHURONG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Construction machine with large-diameter combined slewing mechanism

    WANG DIANWEN / LI YANAN / LI ZHI et al. | Europäisches Patentamt | 2024

    Freier Zugriff