Inspection well is needed for water drainage pipe jacking project in municipal engineering construction, and the deep ones are usually built by sunk tube method. According to a real project, this paper dissertates the construction technique of deep buried inspection well with sunk tube method under the condition of abundant water existence form the aspect of design theory and construction technique and emphasizes the problems and countermeasures during tube sinkage. The practice shows that inspection well with sunk tube method could resolve the difficulty of construction in Water-soaked Stratum.
Construction Technique of Inspection Well for Water Drainage Pipe Jacking Project with Sunk Tube Method
ICMEAT, International Conference on Materials Engineering for Advanced Technologies, 2011 ; 1283-1288
Key Engineering Materials ; 480-481
2011
6 Seiten
Aufsatz (Konferenz)
Englisch
Modular pipe-jacking well construction equipment and using method
Europäisches Patentamt | 2021
|Pipe jacking device special for water conservancy project
Europäisches Patentamt | 2023
|Transportation device for trenchless pipe jacking construction
Europäisches Patentamt | 2020
|Stern tube Jacking Up System and Stern tube Jacking Up Method
Europäisches Patentamt | 2019