Inspection well is needed for water drainage pipe jacking project in municipal engineering construction, and the deep ones are usually built by sunk tube method. According to a real project, this paper dissertates the construction technique of deep buried inspection well with sunk tube method under the condition of abundant water existence form the aspect of design theory and construction technique and emphasizes the problems and countermeasures during tube sinkage. The practice shows that inspection well with sunk tube method could resolve the difficulty of construction in Water-soaked Stratum.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Construction Technique of Inspection Well for Water Drainage Pipe Jacking Project with Sunk Tube Method


    Beteiligte:


    Erscheinungsdatum :

    2011


    Format / Umfang :

    6 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Modular pipe-jacking well construction equipment and using method

    SUN HUANBIN / LIU KELIANG / DUAN YUSAN et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Pipe jacking device special for water conservancy project

    XU YAOWU / XU YAOWEN / YANG XIAOYAN et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Supporting device for pipe jacking construction

    ZHAO FUYUAN / CHANG SONG / WANG LIANYUE et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Transportation device for trenchless pipe jacking construction

    SUN ZONGJUN / SUN TAO | Europäisches Patentamt | 2020

    Freier Zugriff

    Stern tube Jacking Up System and Stern tube Jacking Up Method

    Europäisches Patentamt | 2019

    Freier Zugriff