The San Diego County Water Authority (Authority) recently completed construction of Pipeline 5 Extension. Construction operations were continuous throughout the 1997/1998 wet 'El Nino' winter. Stormwater runoff during two separate heavy rainfall events caused flooding to occur in a low-lying valley along the pipeline alignment. The Authority thus, evaluated the impact and implemented repairs that would provide a safe and reliable pipeline throughout the design service life. Structural analysis determined induced stresses on welded joints and effects on pipe materials.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Effect of multiple floating events on a 275 cm (108-inch) diameter pipeline


    Beteiligte:
    Reed, G.E. III (Autor:in) / Stine, G.P. (Autor:in) / Stift, M.T. (Autor:in)


    Erscheinungsdatum :

    1999


    Format / Umfang :

    12 Seiten


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch