The paper describes the planning and installation of an offshore platform piled foundation in hard, overconsolidated clay, located north of the sixtieth parallel in the British Sector of the North Sea. The successful installation of the piles for the steel jacket platform in the Heather field is used as an illustrative example throughout the paper. Engineering considerations necessary for a successful installation are outlined starting from site selection and carried through the final comparison between pile capacity, pile driveability and pile driving experience. (Kursetz)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Installing a piled foundation in hard, overconsolidated North Sea clay for the Heather platform


    Weitere Titelangaben:

    Installierung der Pfeilerfundamente im harten, ueberverdichteten Lehm des Nordseebodens bei der Plattform des Heather-Sektors


    Beteiligte:
    Durning, P.J. (Autor:in) / Rennie, J.A. (Autor:in) / Ruckstuhl, E.J. (Autor:in)


    Erscheinungsdatum :

    1978


    Format / Umfang :

    8 Seiten, 9 Bilder, 1 Tabelle, 10 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    Geotechnical Behavior of Overconsolidated Surficial Clay Crusts

    Lutenegger, Alan J. | Online Contents | 1995


    Optimizing the Unconnected Piled Raft Foundation for Soft Clay Soils: Numerical Study

    El Kamash, Walid / El Naggar, Hany / Nabil, Marwa et al. | Springer Verlag | 2020